Building assembly
According to PAS 1192-2:2013: Specification for information management for the capital/delivery phase of construction projects using building information modelling (BIM), an assembly is a:
'Group of components or types to enable the reuse of standardised design or specification elements improving productivity of design and delivery as well as providing a location to hold specifications and lessons learnt in a simple and useable way. They may hold benchmark data for cost and carbon impacts.
The contents of assemblies may themselves have attributes and classifications. These properties may include key data which is attached (to the object) for use once it is placed into a model and may include cost, CO2, programme, maintenance and other key information.'
Sub-assemblies are: 'Major building elements that are manufactured offsite, potentially using other offsite manufactured components. Examples include balustrading assemblies, facade cassette panels and preassembled M&E elements.' Ref BIM Overlay to the RIBA Outline Plan of Work, published by the RIBA in 2012.
DfMA Overlay to the RIBA Plan of Work, Mainstreaming Design for Manufacture and Assembly in Construction, 2nd Edition, published by the RIBA in 2021, defines sub-assemblies as: ‘Major building elements that are manufactured off site, potentially comprising a combination of components. Examples include walls, floors, roofs, balconies, balustrading assemblies, façade cassette panels and pre-assembled M&E elements.’
The Product Platform Rulebook, Edition 1.2 March 2023, published by the Construction Innovation Hub, defines an assembly as: ‘A combination of components.’
NB: See also: Assembly area and Assembly and recreation definition.
[edit] Related articles on Designing Buildings
Featured articles and news
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherit assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
The 2025 draft NPPF in brief with indicative responses
Local verses National and suitable verses sustainable: Consultation open for just over one week.
Increased vigilance on VAT Domestic Reverse Charge
HMRC bearing down with increasing force on construction consultant says.
Call for greater recognition of professional standards
Chartered bodies representing more than 1.5 million individuals have written to the UK Government.
Cutting carbon, cost and risk in estate management
Lessons from Cardiff Met’s “Halve the Half” initiative.
Inspiring the next generation to fulfil an electrified future
Technical Manager at ECA on the importance of engagement between industry and education.
Repairing historic stone and slate roofs
The need for a code of practice and technical advice note.
Environmental compliance; a checklist for 2026
Legislative changes, policy shifts, phased rollouts, and compliance updates to be aware of.